top of page

(db)_008_LIDO_LND_GB_01

(db)_008_LIDO_LND_GB_02

(db)_008_LIDO_LND_GB_14

(db)_008_LIDO_LND_GB_01
1/14
SOUTHWARK LIDO
2008 EXYZT
Temporary Architectural Installation
SE1 LONDON
London Festival of Architecture,
a public space with swimming pool, bar, events and sauna.
MATERIALS_
Scaffolding, pine timber, thermic plastic, Lighting, plumbing and sound equipment.
Project No 1 at 100 Unionstreet,
as member of EXYZT
Design and production: EXYZT
Photos: Brice Pelleschi
bottom of page